Multi-Family Office · Digital Infrastructure

Powered land to live load in eight months.

A multi-family office that acquires powered land and powered shells and builds complete AI data centers on them. Everything but the GPUs, on permanent family capital.

0MORecord Delivery
$0MCommitted Capital
Operated by a multi-family office · Backed by and alongside
PAGAsia-Pacific Alternatives · $55B+ AUM MercuriaGlobal Energy & Commodities · Founding Capital Anchor FamiliesEvergreen Commitments
Sheet 01 — The PlatformLand · Delivery · Capital · Tenancy

What we do

The three scarcest inputs to AI, held in one hand.

EST. 2022 — DALLAS, TX

Compute is the new heavy industry, and its constraints are physical: energized land, delivery speed, and patient capital. Most developers control one. Ferrock AI was structured — deliberately — to control all three.

We are operated as a multi-family office, which means we answer to permanent capital instead of fund clocks. We buy or joint-venture the ground, secure the power, and deliver the entire data center — substation, shell, cooling, fiber, controls. Everything but the GPUs. Then we hold what we build.

Sheet 02 — Vertical IntegrationDirt → Racks, One Owner

Who you're dealing with

The buyer, not a broker.

Whether you hold the deed, an option, or a position you're ready to trade, you're dealing with the end owner. The name on your contract is the name on the money, the factory, and the lease. No assignment, no financing out, no shopping your site around.

Layer 01

Land & Power

Site control, entitlement, water, interconnection. Carried on our balance sheet from LOI to energization.

LOI → ENERGIZATION
Layer 02

Turnkey Delivery

Factory-built halls, 90% complete at shipment, commissioned in parallel with sitework. Everything but the GPUs.

48 MW BLOCKS · 8 MO
Layer 03

Permanent Capital

Evergreen family commitments. We underwrite decades, not exit windows.

$500M COMMITTED
Layer 04

Tenancy

We don't build on spec. Blocks are shaped to signed load letters from a standing tenant network.

20+ COUNTERPARTIES

Holding powered land?

Sell to us, or build with us.

Sell outright at powered-land value, or put your acres into the campus and hold alongside us. We answer inside a week.

  • LO-1Family balance sheet. No financing contingency. Nine-day record close.
  • LO-2Tenant-secured before steel. Your ground becomes a campus, not a land-bank position.
  • LO-3Structures that keep you in. Hold upside in the finished campus.
  • LO-4One conversation, principal to principal, in confidence.
Get in Touch →
Ferrock AI campus energized at golden hour 48 MW Energized — Month 8

The record

0MONTHS

Dirt in January. Live load by September.

Our first campus energized 48 MW eight months after groundbreak, on ground we already held and power we already carried. The next blocks are on the same schedule.

We don't publish the rest of the campus's numbers; the register is shared under NDA.

How Eight Months Happens →
Sheet 03 — FootprintERCOT · PJM

Footprint

Where we build.

ERCOT and PJM anchor the position, with PAG alongside as the platform grows.

FIG. 03-A — US CAMPUSES · EQUIRECT. PROJ.
Energized / BuildingPowered Land
Sheet 04 — ScheduleThe Eight-Month Standard

Speed, engineered

The schedule, compared.

Δ 22 MONTHS RECLAIMED

A conventional build waits for land, then permits, then power, then steel. We start from powered land and factory-built halls, so the critical path runs through a production line.

Inside the Eight-Month Standard →
Ferrock AI — groundbreak to energization8 MO
Fab ∥ SiteworkSet + Fit-outEnergize
Conventional stick-built delivery30 MO
DesignPermitsShellMEPFit-outCommission
MO 0MO 6MO 12MO 18MO 24MO 30