Sheet 02 — Turnkey Delivery

The Eight-Month Standard.

Groundbreak to energization in eight months. The complete facility, substation to white space. Done once at FRK-TX1, engineered to repeat.

Sheet 02-A — MethodParallel > Sequential

Why modular wins

Built indoors, in parallel.

90% FACTORY-COMPLETE AT SHIPMENT

While foundations cure and the substation energizes on site, complete building sections are welded, fitted, and tested hundreds of miles away. The two schedules run at once.

What arrives is not a container. It is a finished slice of a Tier III-design facility, pre-commissioned as it ships.

M-01 / Manufacture

Built indoors, tested twice

Every block leaves the line with its electrical rooms already energized once. Tested in the factory, commissioned after the crane.

FAT + ICT on every block
M-02 / Parallelize

Sitework never waits

Civil, substation, and utility scopes run alongside fabrication. The critical path is whichever finishes last, never the sum.

Fab ∥ site, month 0
M-03 / Repeat

The same block, every time

Same block, same drawings, same crews, every campus. The risk falls out with repetition.

One design · every grid
Sheet 02-B — The Record · FRK-TX1Groundbreak → Energization · 8 MO

Month by month

How eight months actually happened.

MO 0–1

Release to fabrication

Land already powered, drawings already permitted. The factory cuts steel the week civil crews mobilize.

MO 2–4

Foundations ∥ modules

Piers cure while the first hall reaches 80% fit-out indoors. Long-lead gear, bought at land close, arrives on schedule.

MO 5–6

Set, stack, seal

Ninety-six module sets in six weeks. Commissioning starts in the first hall while the last one is still landing.

MO 7–8

Energize

Backfeed, five-day IST, utility witness. 48 MW live, eight months after the first shovel.

Sheet 02-C — Platform Specs48 MW Block · Rev D
Prefabricated steel module in transit to site Block Section 07 / 96 90% Complete at Shipment

What tenants get

The 48 MW block, in numbers.

Block size48 MW critical IT, phased per campus
Rack density30–132 kW, direct liquid-to-chip ready day one
Design PUE1.15 annualized, closed-loop heat rejection
Water0 potable gallons for cooling at steady state
ResilienceConcurrently maintainable; Tier III design principles
StructureFully welded steel, engineered per-site for wind, seismic, snow
Delivery8-month standard from powered shell release
Sheet 02-D — PartnershipFerrock × Brightray

Our delivery partner

Built with Brightray.

Brightray pioneered fully prefabricated data center construction. Hundreds of projects, and a record 90 MW campus delivered in eight months.

Ferrock holds priority capacity on their production lines and pairs it with what no contractor can supply: powered land, purchased gear, and capital that never waits on a close.

Server hall aisle in low light

Capacity, on schedule

Need capacity on a real date?