Steel framework rising against the sky

Sheet 05 — About

Named for a material that gets stronger under pressure.

Ferrock: iron and rock. A steel-dust mineral that cures harder than concrete and absorbs carbon while it sets. We took the name as a standard.

Sheet 05-A — The FirmEst. 2022 · Dallas

Who we are

A family office that develops.

85 PROFESSIONALS · 4 OFFICES

Ferrock began in 2022, when families who had built fortunes in energy, logistics, and real assets reached the same conclusion at the same dinner: the AI buildout would need owners, not middlemen.

So we structured differently: a family office that develops, rather than a developer that fundraises. Four years later the platform controls 2.6 GW on two continents and still answers to the same investment committee it started with. The partners sign the interconnection agreements personally.

2022

The platform forms

Ferrock Holdings capitalized by Mercuria and the anchor families.

2023

First ground closes

West Texas acreage under control, with an executed transmission path carried on our own balance sheet.

2024

Brightray alliance

Priority factory capacity secured. The 48 MW block design is frozen and pre-permitted.

2025

Eight months, proven

FRK-TX1 energizes 48 MW eight months after groundbreak. The standard becomes a record.

2026

Two continents

The PAG partnership takes the platform to Johor and Kansai. Controlled pipeline reaches 2.6 GW.

Sheet 05-B — PrinciplesHow We Operate
P-01

Own the constraint

Whatever is scarcest, we would rather own than schedule around.

P-02

Underwrite decades

No fund clock. No forced sales. We build what we would be proud to hold in thirty years.

P-03

Be a good neighbor

Water-light, quiet, locally hired, tax-positive. We build campuses counties want more of.

Substation switchyard at dusk

Built to outlast the cycle.