
Sheet 03 — Footprint
Seven campuses. Two continents. One register.
2.6 GW of controlled pipeline across ERCOT, PJM, SERC, and with PAG, the Johor and Kansai corridors. The register itself is not published.
Sheet 03-A — Where We Stand3 Grids + APAC
FIG. 03-A — US CAMPUSES · EQUIRECT. PROJ.
Energized / BuildingPowered Land
The numbers we publish
What we publish, and what we don't.
Aggregates below. Campus-level engineering, interconnection, and availability live in the register, shared under NDA, usually within a day of a signed request.
Request the Register →0MWEnergizedDelivered to the Eight-Month Standard.
0MWUnder ConstructionFirst CODs 2027.
0.0GWPowered Land & PlannedHeld on our balance sheet.
0.0GWTotal ControlledAcross seven campuses, two continents.
Beyond the map
Further sites in exclusive diligence.
Announced when closed.
