Dallas  ·  Singapore  ·  Hong Kong LP Portal ↗    Contact →
Home00 Powered Land01 Delivery02 Footprint03 Capital04 About05 Get in Touch
Data center corridor from above

Sheet 03 — Footprint

Seven campuses. Two continents. One register.

2.6 GW of controlled pipeline across ERCOT, PJM, SERC, and with PAG, the Johor and Kansai corridors. The register itself is not published.

Sheet 03-A — Where We Stand3 Grids + APAC
FIG. 03-A — US CAMPUSES · EQUIRECT. PROJ.
Energized / BuildingPowered Land

The numbers we publish

What we publish, and what we don't.

Aggregates below. Campus-level engineering, interconnection, and availability live in the register, shared under NDA, usually within a day of a signed request.

Request the Register
0MWEnergizedDelivered to the Eight-Month Standard.
0MWUnder ConstructionFirst CODs 2027.
0.0GWPowered Land & PlannedHeld on our balance sheet.
0.0GWTotal ControlledAcross seven campuses, two continents.

Beyond the map

Further sites in exclusive diligence.

Announced when closed.

Industrial cooling infrastructure

Build-to-suit

Build-to-suit, on ground we already hold.